01 / 06
Foundation of the package
Plans & engineering
The drawings and structural coordination that connect your design to the components prepared for the project.
- IncludedStructurally engineered plan setPrepared around the design and applicable project criteria.
- IncludedStructural drawingsDocuments that guide the coordinated framing and connections.
- IncludedPackage coordinationPlans aligned with the selected timber, wall, window, and door systems.
Permit submission and local permitting remain outside the material package.
02 / 06
The structural shell
Exterior structure
Choose a framing path that matches the home’s architecture, performance goals, and project scope.
- ConfiguredConventional framing systemDouglas fir wall framing, plates, sheathing, roof rafters, and related hardware.
- ConfiguredSIP wall and roof panelsInsulated panels with openings, headers, and chases prepared to the plans.
- ConfiguredHeavy timber frameDouglas fir posts, beams, braces, rafters, connections, and fasteners.
The selected exterior framing system and any upgrades are defined in the project proposal.
03 / 06
Spaces within the shell
Interior framing
Interior framing components can arrive coordinated with the structural system and the home’s room layout.
- ConfiguredLoft and subfloor systemTJI or dimensional floor joists with tongue-and-groove subfloor panels.
- ConfiguredInterior wall framingKiln-dried dimensional framing and coordinated plates.
- ConfiguredStair packageA standard stair system, with timber frame upgrades available.
Some builders prefer to cut selected interior components on site; this is coordinated during package planning.
04 / 06
Close in the home
Exterior finishes
Exterior materials can be coordinated with the design so the shell arrives closer to the intended finished character.
- ConfiguredSiding, soffit, fascia & trimExterior finish materials selected for the home’s design direction.
- ConfiguredWindows & exterior doorsPella systems and related exterior door hardware selected to the plans.
- ConfiguredDeckingProject-specific decking selections where included in the scope.
Additional exterior finish options can be reviewed with the project team.
05 / 06
Seal and connect
Protection & hardware
Weatherization materials and structure-specific hardware help support a coordinated enclosure and assembly.
- IncludedWeatherization materialsHouse wrap, seam tape, and window and door flashing tape.
- IncludedEngineer-specific hardwareConnections selected to support the engineered structural system.
- IncludedHangers and frame hardwareLoft and subfloor hangers plus post-and-beam hardware.
Final hardware quantities and types follow the engineered project drawings.
06 / 06
Extend the package
Optional upgrades
Additional systems and finishes can expand the package around the experience and level of completion you want.
- OptionalTimber enhancementsMortise-and-tenon joinery, pre-staining, and timber stair or floor options.
- OptionalInterior design & finish packageAdditional interior selections and finish materials coordinated with the home.
- OptionalTongue-and-groove surfacesWood wall, ceiling, and soffit covering options.
Optional upgrades add cost and are included only when selected in the project scope.